Needless to say a lot more was involved than just building something for the 2 meters to sit in.

The electrical connection from the power lines to our house have always been a bit tenuous, so it was decided that it would be advantageous to change those wires now from the CFE post to the house.  A new post had already been built to put the meters in but it wasn't tall enough to receive the wires ~ so Dave built a column on top of the post.  There is a pipe in the post that receives the wires WAY UP IN THE AIR (22 feet) and feeds them into the post built for the meters.
    

Now that wire goes to the new electrical panels ~ 

Did I already show you that?

Not wanting to find ourselves digging up the driveway in the future and going through all this "dirty" work again, David decided he'd prepare the bodega for "luz".
I think that should probably do us for electrical improvements for a while, don't you?